OT/ICS Risk Assessment at two water treatment plants and the operational control center of a water and sanitation company. Anonymized data.
The central question of the Risk Assessment is not which vulnerabilities exist, but what physically happens to the process if an automation function is compromised. It is the adaptation of established process risk analysis techniques, such as HAZOP and LOPA, to the cyber domain: the Cyber-PHA of ISA/IEC 62443-3-2.
The vulnerability scan still exists, but it serves as evidence for likelihood, not as the final result. Priority is now defined by physical impact, in a language the board understands.
System under consideration, zones, conduits, specialists and those responsible for acceptance.
Profile from TA1 to TA5, approved by consensus, without underestimating or inflating the risk.
Automation functions by Purdue level and consequences identified through guiding questions.
Severity without defenses in four dimensions and likelihood by an objective rubric.
Risk register, controls linked to ISA/IEC 62443-3-3 and recalculation of the residual risk.
| Risk range | Classification | What to do |
|---|---|---|
| 17 to 25 | Unacceptable | Immediate action; cannot be accepted |
| 9 to 16 | Conditionally tolerable | Documented controls with a deadline |
| 1 to 8 | Acceptable | Monitor, no mandatory action |
Likelihood by equipment category: attractiveness 15%, capability 25%, exposure 35% and defense 25%. Severity is assessed as if no controls existed, and the criticality of each function comes from its worst scenario.
The chosen reference actor was TA3: organized crime with knowledge of industrial systems, the most likely for the sector. Plant A had 8 unacceptable scenarios, with a risk of 20 out of 25.
At plant A, 14 scenarios were awaiting data and were left out of the comparison.
Each control was linked to the system requirements of ISA/IEC 62443-3-3 and to the target security level (SL-T), separating what is configuration from what is acquisition. The sequence matters: segmentation first.
SCADA servers, SCADA Mobile and the MQTT broker leave the corporate data center and move to the industrial network.
The industrial DMZ now breaks every connection, with an MQTT relay, a SCADA Mobile proxy and patch/antivirus.
Central access in the DMZ and local access in the industrial network; third parties no longer reach the OT network directly.
Industrial IDS with traffic mirroring on the control switch, to see what cannot be seen today.
Diagnosis
Plan
Architecture
The Risk Assessment starts with a scoping meeting with the automation coordination team.